39326
Accession Number
9482
Title Of Article Chaper
Redecking Charing Cross Bridge
Title Of Journal Book
Engineer
Volume
219
Issue
11
Pages
1445-1448
Literature Type
Serial
Literature Level
Analytic
Abstract
A description of the materials found to have been used in the construction of the bridge in 1863 introduces an account of the redecking work. Ordinary crown wrought iron of about 355 MN/m<sub>2</sub> (23 y/in<sub>2</sub>) tensile strength was used for fabricated girders with puddled steel pins at the nodes. The extent and positions of erosion are commented on and the nature of the replacements described together with details of the difficult operations involved. -- AATA
pub_id
39326