28401
Accession Number
32561
Author
Boorstein, James;Dorman, Nicholas
Title Of Article Chaper
A Slightly Odd-Shaped Room; The Italian Room at Seattle Art Museum: Collaborating to get the job done
Title Of Journal Book
Postprints of the Wooden Artifacts Group Presented at the 36th Annual Meeting of the American Institute for Conservation, Denver, Colorado
Pages
44295
Collation
6 p. : ills.
Publisher
American Institute for Conservation Wooden Artifacts Group
Language Of Text
English
Literature Type
Monograph
Literature Level
Analytic
Abstract
In 2003, staff at Seattle Art Museum geared up for the most comprehensive series of transformations in the museum's history. The spectrum of activity and change at the institution ranged from the construction of a new downtown museum, building a nine-acre sculpture park on the Seattle waterfront and wide-ranging renovation of storage areas at Seattle Art Museum and Seattle Asian Art Museum. In the midst of these great changes, a small but highly complex collaborative project took place: the conservation and installation of SAM's sixteenth century wood paneled Italian Room. Following exploratory conversations with colleagues at other museums, SAM staff selected James Boorstein and Traditional Line to work with them on this project. A defining collaborative character distinguished this project from the initial planning phase to the treatment and installation of the panels and beyond these stages to the way the room functions in galleries that are now open to the public. In addition to the SAM conservation and Traditional Line teams, myriad personalities worked together to resolve the project; curators, architects, engineers, art-handlers, preparators, stone-carvers, cabinet-makers, scientists, contractors, fund-raisers, donors (in no particular order) all played a role in the realization of the Italian Room, which can be considered a microcosm of museum activity. In this paper, James Boorstein, Nicholas Dorman and Sarah Kleiner will share their experiences of planning and installing the room in the new SAM galleries and the contributions made by the various collaborative parties in the process.
Keywords
room;collaboration;plan;install
pub_id
28401