23312
Accession Number
7928
Title Of Article Chaper
Mauertrockenlegung
Title Of Journal Book
Restauratorenblaetter
Volume
4
Pages
48-62
Language Of Text
German
Literature Type
Serial
Literature Level
Analytic
Abstract
A brief review of causes and methods of measuring the wetness of walls. The principles of and planning for individual drying systems are cited. A systematic description of 4 mechanical inhibitors, Electroosmose, chemical injections or capillary hydrophobization, and porous plasters is included. A standard price list and a table of methods appropriate to type and area of walls to be dried are provided.
Keywords
Building, humidity electroosmosis; Building, wall; Building, humidity; Building, humidity masonry; Building, humidity masonry drying; Humidity, measurement; Synthetic-resin, injection grouting; Building, humidity insulation injection; Cement, injection grouting; Building, drainage; Building, humidity insulation -- ICCROM
pub_id
23312
Title Translation
Drying of walls